top of page
Papers Creative Agency

Projects

 In addition to onboarding to new roles, revitalizing communications, events, and committees,  and working with the management company on items of community interest both current and previously deferred,  the Board and Committees have been working items like these listed below.

Previous term projects have been moved to this page:  link 

Community Survey

What do homeowners think about living in our community? This is the first survey (planned annually) for feedback on aspects of our community and it's membership. 

opinion survey.JPG

Caring for Our Common Area Parks

Policy and signage were developed to prohibit motorized vehicles from treading on turf and hardscape areas, thus preserving our parks for the enjoyment of the community. 

Cycle

Landscape Maintenance

A new landscape services provider, Genesis, was hired in the Fall of 2024.  Our landscape is significantly improving!

Grass Close Up

Drywell Maintenance

Drywells are underneath our greenspace areas, and hold excess water from monsoons. They are regularly inspected and maintained. 

Water

Streets -
Surface Crack Fill and Seal Coat

Sunland Asphalt performed 5 year mainten- ance for streets.  This resealing is a top-coat that keeps underlying asphalt from drying out. Eventually, the top 3" of asphalt will need to be ground up and replaced. 

​

neighborhood street in arizona.jpg

Irrigation Controller Replacement

New irrigation timers that have ET algorithm capability appropriate for the Arizona climate and soil conditions were installed. Commercial timers with the number of stations equal to or greater than the number of valves were chosen, correcting deficiencies in previous equipment. 

Hunter irrigation controller.JPG

Vendor Management

Supplement property management company efforts to ensure appropriate oversight

Accounting Tasks

Wall Evaluation Study

ESS Engineering Services was contracted to measure selected common walls, to determine if there is movement.  Many communities regularly monitor their common walls.   

Shadow on Concrete Wall

Gate Code Update Project

Our Community gate access methods are being updated this year. 

Front View of Mansion

Irrigation Maintenance

Ongoing repairs to our aging irrigation system are ongoing. 

broken sprinkler.JPG

Reclaimed Water Source Inlet

Since switching to reclaimed water for irrigation, we no longer need a backflow prevention assembly.  It was replaced when it started to leak. The new straight pipe and shutoff are purple, per code for reclaimed water plumbing. 

IMG_9565 - Copy.JPEG

Landscape Erosion Remediation

Over the years, soil levels have worn away, leaving potential trip hazards and exposing areas of view fence walls.  This deferred maintenance was addressed in areas of the main park and playground park. 

landscape pix.JPG

Annual Budget

Budgets are evaluated and submitted in the quarter prior to the next fiscal year.  The 2026 proposed budget is currently in development. Next-year budgets are printed on the back of the December assessment billing statement. 

Bill

Mesquite Grove Estate Homeowner's Community Association

©2025 by MGE Community Association. Proudly created with Wix.com

Copyright © 2025 Mesquite Grove Estates HOA - All Rights Reserved

bottom of page